Home> Projects> China Construction Sixth Engineering Bureau Co., Ltd. Luzhou Yangtze River Second Bridge
China Construction Sixth Engineering Bureau Co., Ltd. Luzhou Yangtze River Second Bridge

Bridge Specifications & Design

  • Type: Double‑deck, gravity‑anchored suspension bridge with two towers and central spans of 576 m zjql.cscec.com+7zh-cn.tylin.com+7tylin.com+7.

  • Total length: Approximately 1,016 m (main bridge), part of a ~4.55 km overall corridor including connecting expressway links cscec.comzjql.cscec.comThe Paper.

  • Deck width: 31.1 m zh-cn.tylin.com+1tylin.com+1.

  • Traffic design:

  • Tower heights: East tower ~133.5 m; west tower ~123 m, framed in portal (“gate”) shapes symbolizing a gateway to Luzhou.

     

    Timeline & Milestones

    • Designer/Engineer of Record: TYLin International (China), whose design incorporated local cultural integration via portal frame towers representing a welcome symbol China Daily Regional+4tylin.com+4zh-cn.tylin.com+4.

    • Construction delivered by: China State Construction Engineering Sixth Bureau, in cooperation with local entities cscec.comThe Paper.

    • Opening Date: Officially opened to traffic on July 1, 2023. The test opening allowed upper deck vehicular traffic; lower deck rail infrastructure and related finishing works continue toward full commissioning sichuan.scol.com.cn+1tylin.com+1.

Home> Projects> China Construction Sixth Engineering Bureau Co., Ltd. Luzhou Yangtze River Second Bridge
We will contact you immediately

Fill in more information so that we can get in touch with you faster

Privacy statement: Your privacy is very important to Us. Our company promises not to disclose your personal information to any external company with out your explicit permission.

Send