
Bridge Specifications & Design
-
Type: Double‑deck, gravity‑anchored suspension bridge with two towers and central spans of 576 m zjql.cscec.com+7zh-cn.tylin.com+7tylin.com+7.
-
Total length: Approximately 1,016 m (main bridge), part of a ~4.55 km overall corridor including connecting expressway links cscec.comzjql.cscec.comThe Paper.
-
Deck width: 31.1 m zh-cn.tylin.com+1tylin.com+1.
-
Traffic design:
-
Upper deck: 6 lanes for vehicular traffic + pedestrian walkways
-
Lower deck: 2 lanes reserved for future rail transit (plus maintenance walkway) China Daily Regional+6cscec.com+6tylin.com+6tylin.com.
-
-
Tower heights: East tower ~133.5 m; west tower ~123 m, framed in portal (“gate”) shapes symbolizing a gateway to Luzhou.
Timeline & Milestones
-
Designer/Engineer of Record: TYLin International (China), whose design incorporated local cultural integration via portal frame towers representing a welcome symbol China Daily Regional+4tylin.com+4zh-cn.tylin.com+4.
-
Construction delivered by: China State Construction Engineering Sixth Bureau, in cooperation with local entities cscec.comThe Paper.
-
Opening Date: Officially opened to traffic on July 1, 2023. The test opening allowed upper deck vehicular traffic; lower deck rail infrastructure and related finishing works continue toward full commissioning sichuan.scol.com.cn+1tylin.com+1.
-